Laying and handling guide

Medium voltage cables: laying and handling

Single and three core cables to HD 620, IEC 60502-2 and BS 6622.

Every line names every source that states it and how it was seen; where sources disagree, each value is shown with its source. IEC, EN and HD documents and makers come first, national rules after them with their country.

Laying temperature and pre-warming

  • The limit is the temperature of the cable itself, not of the air: a drum stored in the cold stays cold after the air warms.Sources: HD 620 Part 1 A.4.12; HD 603 3-G, 5-G, 3-I, 4-B; Nexans 2021 p. 11 (read in the standard text)
  • Colder than its minimum: warm the whole drum for 1 to 2 days (at least 24 hours in HD 620 10-B). A full drum near the limit can take 20 to 30 hours to warm through (10-F).Sources: HD 620 Part 1 A.4.12; 10-F-20; 10-B-36 (read in the standard text)
  • Nexans: Warm at +10 °C or more for at least 24 hours, then unreel within 2 hours at about 20 m/min; below -5 °C outside, postpone the pull or warm the drums first.Sources: Nexans 2021 p. 11 (maker's document)
  • A cable stored below its minimum laying temperature takes no shocks, impacts, bending or twisting.Sources: HD 620 Part 1 A.3.1; HD 603 3-I 3.3; Nexans Belgium 2022 (read in the standard text)
  • HD 603 3-G, 5-G · HD 620 10-A, 10-C, 10-F: Cable temperature while laying and fitting accessories: at least -5 °C with a PVC sheath, -20 °C with a PE sheath; warm the cable when it is colder.Sources: HD 603 3-G-15 item 2; 5-G-15 item 2; HD 620 10-A-25 item 14; 10-C-26 item 14; 10-F-21 (read in the standard text)
  • HD 620 10-G: At least 0 °C.Sources: HD 620 10-G-27 (read in the standard text)
  • HD 620 10-N, 11-N: At least -5 °C.Sources: HD 620 10-N-14 (read in the standard text)
  • HD 620 10-L: At least 5 °C.Sources: HD 620 10-L-25 (read in the standard text)
  • HD 620 10-P: -5 to +40 °C cable temperature while laying; -25 to +60 °C air after laying.Sources: HD 620 10-P-19 (read in the standard text)
  • HES Kablo: Lowest air temperature while laying: +3 °C for PVC cables, -5 °C for XLPE cables.Sources: HES Kablo p. 391 (maker's document)

National rules

  • France HD 620 10-B: At least 0 °C for "G" and PVC sheaths; HDPE sheath -15 °C without a metal foil, 0 °C with one.Sources: HD 620 10-B-36 (read in the standard text)
  • India IS 1255: Warm a cable colder than 3 °C, whatever its insulation, in a heated building or a hot-air tent for at least 24 hours to about 10 °C, and lay it swiftly.Sources: IS 1255 8.4, p. 26 (read in the standard text)
  • Italy HD 620 10-I1, 10-I2, 12-I: At least -25 °C, while laying or handling.Sources: HD 620 10-I1-15, 10-I2-17, 12-I-16 (read in the standard text)
  • Netherlands HD 620 10-J: At least -5 °C.Sources: HD 620 10-J-39 item 12 (read in the standard text)
  • Norway HD 620 10-K, 12-K: At least -20 °C.Sources: HD 620 10-K-19 item 4 (read in the standard text)
  • Poland HD 620 10-R: At least 0 °C; -5 °C (PVC sheath) or -20 °C (PE sheath) under the maker's special conditions.Sources: HD 620 10-R-21 item 14 (read in the standard text)
  • Spain HD 620 9-E, 10-E1, 10-E2: At least 0 °C.Sources: HD 620 9-E-15 (read in the standard text)
  • Sweden HD 620 10-M: HFFR sheath: at least 0 °C with normal care, -10 °C with special care; PE sheath -20 °C.Sources: HD 620 10-M-15 (read in the standard text)
  • United Kingdom BS 6622, BS 5467, BS 7846: Cable and air above 0 °C for the previous 24 hours, or special precautions that keep the cable above 0 °C.Sources: BS 6622 C.1; BS 5467 B.2; BS 7846 A.7.2; HD 620 10-O-23; Anixter Sec. 20 p. 20-43 (read in the standard text)

Laying in winter? Pro checks your town and month against this limit. See Pro

Bending radius

  • IEC 60502-2: Gives no installation bending radius; the values below come from HD 620.Sources: IEC 60502-2 18.2.4 (type test cylinder only) (read in the standard text)
  • D is the cable's outer diameter. One controlled bend: a single bend next to a joint or termination, made by skilled workers over a template, the cable at or warmed to 30 °C.Sources: HD 620 Part 1 A.4.6; HD 603 3-G-16 (read in the standard text)
  • HD 620 10-A, 10-C, 10-R: 15 D while laying; 7.5 D for one controlled bend.Sources: HD 620 10-A-24, 10-C-25, 10-R-20 (read in the standard text)
  • HD 620 10-F: While laying 15 D single core, 12 D multicore; for one controlled bend 10.5 D and 8.4 D.Sources: HD 620 10-F-20 (read in the standard text)
  • HD 620 10-G: 30 D single core, 20 D three core while laying.Sources: HD 620 10-G-27 (read in the standard text)

National rules

  • France HD 620 10-B: 15 D while laying; 7.5 D for one controlled bend.Sources: HD 620 10-B-35 (read in the standard text)
  • India IS 1255: PVC and XLPE: single core 15 D up to 11 kV, 20 D above; multicore 12 D up to 1.1 kV, 15 D above. Cores at joints and terminations: more than 12 times the diameter over the insulation.Sources: IS 1255 5.3, Table 5, p. 14; 5.3.2 (read in the standard text)
  • Italy HD 620 10-I1, 10-I3, 12-I: 14 D while laying; 7 D for one controlled bend. D here is the core diameter.Sources: HD 620 10-I1-16, 10-I3-16, 12-I-17 (read in the standard text)
  • Netherlands HD 620 10-J, 12-J: 12 (D + d) single core, 10 (D + d) three core, d the conductor diameter; up to 20 % less allowed.Sources: HD 620 10-J-39, 12-J-39 (read in the standard text)
  • Norway HD 620 10-K, 12-K: 30 D while laying; 15 D for one controlled bend.Sources: HD 620 10-K-19, 12-K-19 (read in the standard text)
  • Spain HD 620 9-E, 10-E1, 10-E2: 20 D while laying; 15 D for one controlled bend.Sources: HD 620 9-E-15, 10-E1-19, 10-E2-16 (read in the standard text)
  • Sweden HD 620 10-M: While laying 15 D single core, 12 D three core; for one controlled bend 10 D and 8 D.Sources: HD 620 10-M-15 (read in the standard text)
  • Türkiye EKAT Çizelge-20: Three-core LV (XLPE or PVC) 12 D; three-core MV 15 D; armoured 15 D; single core 15 D.Sources: EKAT Madde 58 b) 9 (read in the standard text)
  • Türkiye TEDAŞ: As printed by HES Kablo: unarmoured LV 12 D single core, 10 D multicore; unarmoured MV 14 D and 12 D; armoured 15 D and 12 D. It differs from EKAT Çizelge-20.Sources: HES Kablo p. 388 (maker's document)
  • United Kingdom BS 6622: While laying 15 D single core, 12 D three core; for one controlled bend 12 D and 10 D.Sources: BS 6622 Tables C.1, C.2 (read in the standard text)

Pulling force and method

  • On the conductors, with a pulling eye or head: at most 50 N/mm² for copper and 30 N/mm² for aluminium, over the main conductors' total section.Sources: HD 603 3-G-16 and the other guides to use; HD 620 Part 1 A.4.13 a; 10-C-26; IS 1255 5.4.2, p. 15; EKAT Madde 58 b) 10; Nexans 2021 p. 13; HES Kablo p. 391 (read in the standard text)
  • Gather all conductors in the pulling head and clamp them together, so the force spreads evenly.Sources: HD 603 3-I; EKAT Madde 58 b) 10 (read in the standard text)
  • A swivel between the cable grip and the pulling rope.Sources: HD 620 10-R item 15; Draka p. 6 (read in the standard text)
  • Watch the tension all through a machine pull and keep the record with the as-laid documents. Prysmian: a winch with a dynamometer, a preset maximum and automatic stop; Draka: without a tension record the maker may refuse a claim.Sources: HD 620 Part 1 A.4.4; HD 603 3-G 3.3; IS 1255 10.3.5; Prysmian 2024 p. 10; Nexans 2021 p. 16; Draka p. 8 (read in the standard text)
  • Rollers on straight runs every 2 to 4 m (Prysmian) or 3 to 4 m (Nexans for direct burial, IS 1255); at bends several rollers forming a radius larger than the minimum bending radius (IS 1255: corner rollers and at least three solid plates).Sources: HD 620 Part 1 A.4.4; HD 603 3-G 3.3; IS 1255 10.2.2, p. 30; Prysmian 2024 p. 10; Nexans 2021 p. 16, 17 (read in the standard text)
  • Sidewall pressure: the maker's limit, checked before the pull at every bend, roller and deflection point; too much tears the sheath.Sources: BS 7846 A.7.4 d); Nexans 2021 p. 17; Anixter Sec. 20 p. 20-44 (read in the standard text)
  • Guide the cable into a duct along its axis, with a bell mouth at the duct end, in one continuous arc without a reverse bend.Sources: BS 7846 A.7.4 f); IS 1255 6.3.4.4, 6.4.1; Nexans 2021 p. 17; Southwire 2005 p. 3 (read in the standard text)
  • Cable laid out on the ground goes down in a figure of eight, never in rings: rings twist it.Sources: IS 1255 10.2.4.6, p. 32; Draka p. 9; Nexans 2021 p. 19 (read in the standard text)
  • HD 620 Part 1 A.4.13: On a cable grip over the sheath: 3 × D² N (D in mm), never more than on the conductors; three preassembled single cores take 3 times, three parallel cables 2 times a single core's value.Sources: HD 620 Part 1 A.4.13 c, d (read in the standard text)
  • Nexans: A pulling eye on the conductors instead of a stocking for lengths over 800 m or conductors over 630 mm².Sources: Nexans 2021 p. 13 (maker's document)
  • Southwire: Work out the tension section by section (straights, slopes, bends) and the sidewall pressure at every bend, and pull from the end that gives the lower maximum.Sources: Southwire 2005 pp. 13 to 17 (maker's document)

National rules

  • India IS 1255: On a stocking: 9 × D² N for armoured PVC or XLPE cables, 5 × D² N unarmoured, 3 × D² N for armoured paper cables. For armoured cables that is three times the HD 620 value.Sources: IS 1255 5.4.1, p. 15; HD 620 Part 1 A.4.13 c (read in the standard text)
  • India IS 1255: Expected winch force: 15 to 20 % of the cable's weight in a trench without large bends, 20 to 40 % with one or two 90° bends, 50 to 60 % with three, up to 100 % in ducts with bends totalling 360°.Sources: IS 1255 5.5, p. 16 (read in the standard text)
  • Netherlands HD 620 10-J, 12-J: Solid aluminium conductors: 20 N/mm².Sources: HD 620 10-J-39 (read in the standard text)
  • United Kingdom BS 6622: The maximum tension is the maker's value.Sources: BS 6622 D.4.2 (read in the standard text)

Work out the pull for your route: the verdict is free, the numbers and the PDF come with Pro. Pull calculation in the cable designer · See Pro

Depth, cover and laying

  • Choose the way of laying and the bedding for the oversheath; trench walls smooth and free of stones.Sources: HD 620 Part 1 A.4.2 d), A.4.4; HD 603 3-G 1.2 d) (read in the standard text)
  • Single-core cables: all three phases of one system through the same steel pipe or hole; fixings must not form a magnetic ring round one core.Sources: HD 620 Part 1 A.4.9 b); HD 603 3-G 1.4; 3-L 5.1.3; IS 1255 6.3.4.6, 8.8.4; EKAT Madde 58 b) 3, 7 (read in the standard text)
  • Duct inner diameter at least 1.5 D in most HD sections and IS 1255, 1.5 to 2 D in HD 603 3-L, 5-O and 5-P, at least 1.4 D in the Italian sections; keep sand out of the duct.Sources: HD 603 3-G, 5-G, 3-L, 5-O, 5-P, 7-A; HD 620 10-A, 10-B, 10-C, 10-F, 10-I1, 10-R, 12-I; IS 1255 6.3.4.3, p. 18 (read in the standard text)
  • Nexans: Thermal backfill: keep the specified thickness below and above and the trench width along the whole route, and never mix it with native soil, or the cable overheats.Sources: Nexans 2021 pp. 18 to 19 (maker's document)

National rules

  • France NF C 15-100, NF C 13-200: LV at least 0.50 m, HTA (MV) 0.80 m, 0.85 m under vehicle ways and pavements; a warning grid at least 0.20 m above the cable or its protection.Sources: Prysmian France pp. 1 to 2 (secondary source)
  • Germany HD 603 3-G, 5-G · HD 620 10-A, 10-C: At least 0.6 m deep, 0.8 m below roads; shallower only with other protection.Sources: HD 603 3-G-15 item 1.3, 5-G-15; HD 620 10-A-25 item 11, 10-C-26 item 11 (read in the standard text)
  • India IS 1255: At least 0.75 m to the top of the cable for LV and control cables, 0.9 m for 3.3 to 11 kV, 1.05 m for 22 and 33 kV, 1.0 m at road and railway crossings; at least 75 mm of riddled soil or sand below and above, then tiles, bricks or slabs.Sources: IS 1255 6.3.1, 6.3.2, 6.3.6, pp. 16, 19 (read in the standard text)
  • Italy HD 620 10-I1, 12-I: At least 0.8 m with slabs or tiles; 1.70 m for a screened unarmoured cable without protection.Sources: HD 620 10-I1-15 item 5.1.1, 12-I-16 (read in the standard text)
  • Poland HD 620 10-R: At least 0.8 m below ground; under roads, or shallower, with protection.Sources: HD 620 10-R-21 item 11 (read in the standard text)
  • Türkiye EKAT: At least 0.80 m under streets and squares, 0.60 m elsewhere, about 20 cm less with special protection where it cannot be avoided; road and rail crossings in pipes or channels, the top at least 1 m below the road surface or rail foot.Sources: EKAT Madde 58 b) 11, 16 (read in the standard text)
  • Türkiye EKAT: About 10 cm of sieved sand below and above the cable; brick, a concrete slab of at least 6 cm or a plastic cover over the sand along the whole route; a PE warning tape at least 10 cm wide about 30 cm above the cover.Sources: EKAT Madde 58 b) 13 (read in the standard text)
  • United Kingdom NJUG: Depth to the top of the cable: LV 450 mm under footways and verges, 600 mm under carriageways; HV 450 to 1200 mm and 750 to 1200 mm. Yellow marker tape directly above (HV: black and red legend, or concrete tiles).Sources: NJUG Table 1, p. 6 (read in the standard text)
Open groundSand bedWarning tape0.6 mNot found
Minimum cover: 0.6 m, Germany: 0.6 / 0.8 m below road surface; shallower only with other protection (HD 603 S1:1994/A2:2003 3-G-15 item 1.3, 5-G-15; HD 620 S3:2023 10-A-25 item 11, 10-C-26 item 11; read in the standard text). N2XSEY 3x95/16 12/20 kV. To scale: the cover and the cable, Ø 64.6 mm. The sand bed, warning tape and duct are a picture only.

Drum handling

  • Keep the drum upright, its axis horizontal, in storage and in transport; never lay it flat on a flange.Sources: HD 620 Part 1 A.3.2.5, A.3.3.2; IS 1255 7.7, p. 25; Prysmian 2024; Reka (read in the standard text)
  • Never drop a drum. Without lifting gear, use a ramp of about 1:4 (IS 1255: 1:3 to 1:4) with ropes or a winch and a sand bed at the foot.Sources: HD 620 Part 1 A.3.3.3; HD 603 3-I 3.3; IS 1255 7.3, p. 24; Prysmian 2024 p. 6; Reka p. 6; Nexans 2021 p. 4 (read in the standard text)
  • Roll it only short distances on firm ground, in the direction of the arrow on the flange.Sources: HD 620 Part 1 A.3.3.4; HD 603 3-I, 3-L; IS 1255 7.4, p. 24; Prysmian 2024 p. 7; Nexans 2021 p. 3 (read in the standard text)
  • Store it on level, firm, well-drained ground and turn it 90° every 3 months.Sources: IS 1255 7.5, 7.6, pp. 24 to 25; Prysmian 2024 p. 8, 9; Nexans 2021 p. 8, 9; Prysmian Türkiye 3.3 (read in the standard text)
  • Leave the battens on until the cable is about to be laid: they keep off sun and knocks.Sources: HD 620 Part 1 A.3.2.5; BS 6622 D.5.2; IS 1255 7.8, p. 25; Nexans 2021 p. 11 (read in the standard text)
  • Cable ends sealed with caps in transport, storage and laying. A cap missing for over a month, or a wet end: cut back 300 mm, check for moisture and cap again.Sources: HD 620 Part 1 A.3.2.3, A.4.7; HD 603 3-I 3.2; BS 6622 C.3; BS 5467 B.4; BS 7846 A.7.4; IS 1255 7.2, p. 24; Nexans 2021 p. 7; Draka (read in the standard text)
  • Pay out tangentially, never over the flange, with the drum on an axle and jacks and braked. Top or bottom: IS 1255 says off the top; Southwire chooses by where the cable goes (the bottom into a floor conduit, the top into a tray); Nexans Belgium says the bottom, for safety.Sources: HD 620 Part 1 A.4.5; IS 1255 8.2, 8.3, 10.2; Southwire 2005 p. 2 to 3; Nexans Belgium FAQ; Prysmian 2024 p. 10; Draka p. 5, 9 (read in the standard text)
  • HD 620: Drum barrel at least 18 D (10-A, 10-C, 9-E) up to 26 D (10-G, single core), by section.Sources: HD 620 A.3.2.2 of each section (read in the standard text)
  • HD 620 10-A, 10-C, 10-K · HD 603 3-L: Flange over 1.0 m: the drum axis horizontal in transport; in HD 603 3-L, drums over 2.5 t.Sources: HD 620 10-A-24 item 6; HD 603 3-L; Prysmian 2024 (read in the standard text)
  • Nexans: Over 10 t of cable: steel drums; wooden drums carry up to 10 t.Sources: Nexans 2021 p. 2 (maker's document)

Sheath test after laying

  • IEC 60502-2: A d.c. test of the oversheath between each metal screen or sheath and ground, at the level and for the time of IEC 60229 Clause 5; recommended for every new installation. It needs good contact between ground and oversheath (a conductive layer helps).Sources: IEC 60502-2 20.1, 20.2; HD 620 10-K, 12-K (read in the standard text)
  • IEC 60229: Installed cable: 4 kV per mm of oversheath thickness, at most 10 kV, for 1 minute (factory test 8 kV per mm, at most 25 kV).Sources: IEC 60229 cl. 5, p. 9; 3.1, p. 6 (read in the standard text)
  • HD 603 3-G, 5-G · HD 620 10-A, 10-C, 10-R: At most 3 kV d.c. on a PVC sheath, 5 kV d.c. on a PE sheath; faults usually show within 1 minute.Sources: HD 603 3-G 1.6, 5-G 1.6; HD 620 10-A 3.5, 10-C 3.5, 10-R 3.5 (read in the standard text)
  • HD 620 10-F, 10-K, 12-K · BS 6622: A d.c. test of the insulation is not recommended: it may harm it.Sources: HD 620 10-F, 10-K, 12-K; BS 6622 (read in the standard text)
  • Look the cable over before burying it, trace it with a locator afterwards, and check the end caps after the pull.Sources: HD 620 10-R-18 item 1; IS 1255 8.7, p. 27; Nexans 2021 p. 13; Draka p. 8 (read in the standard text)

National rules

  • India IS 1255: A d.c. test of the insulation after installation, 5 minutes, conductor to sheath: 3 kV (0.65/1.1 kV), 18 kV (6.35/11 kV), 37.5 kV (12.7/22 kV), 60 kV (19/33 kV). This goes against the HD 620 and BS 6622 advice not to test the insulation with d.c.Sources: IS 1255 14.2.4, Table 6, p. 60; HD 620 10-F, 10-K, 12-K; BS 6622 (read in the standard text)
  • Netherlands HD 620 10-J: 5 kV d.c. for 5 minutes between screen and earth, first and repeated tests.Sources: HD 620 10-J-37 item 2 (read in the standard text)
  • Poland HD 620 10-R: PE sheath 5 kV d.c., under 100 µA/km; PVC sheath 3 kV d.c., under 800 µA/km; read 1 minute after the current settles.Sources: HD 620 10-R-18 item 5 (read in the standard text)
  • Sweden HD 620 10-M: Up to 5 kV d.c. for 5 minutes.Sources: HD 620 10-M-15 (read in the standard text)
  • United Kingdom BS 6622: Oversheath with a semiconducting layer: 8 kV d.c. for 1 minute; joints insulated from earth, or test before jointing.Sources: BS 6622 C.7.2 (read in the standard text)

Get the commissioning sheet for your own cable with Pro. See Pro

Cable end preparation

The common order of the makers and standards the research found; each step names every source. The lengths depend on the kit: its own instruction decides.

Wonder which lug, termination or joint fits your cable, and how its screen is earthed? See them fitted on your own cable with Pro. See Pro · Members: see them fitted in the designer

  1. Check the kit fits the cable and cut the cable square at its final position.Sources: Ensto PEM1093ENG 2017-04, HIT1 / HOT1 12 to 36 kV (maker's document); TE Raychem ESD-5243-AU-10/09, OXSU-F 36 kV (maker's document); Nexans Euromold IS 24CSJ2-E-09, 12 and 24 kV (maker's document); Prysmian Assembly Instructions 81006A (2022), MST 12 to 36 kV, pp. 1, 3, 4 (maker's document); Nexans Italia IM1778DI.1, MONOi / MONOe-1, p. 2 (1.1) (maker's document); TEDAŞ-MLZ/99-033.B (2023) (read in the standard text)
  2. Remove the outer sheath and any graphite or semicon coat; abrade and clean the sheath next to the cut.Sources: Ensto PEM1093ENG 2017-04, HIT1 / HOT1 12 to 36 kV (maker's document); TE Raychem ESD-5243-AU-10/09, OXSU-F 36 kV (maker's document); Nexans Euromold IS 24CSJ2-E-09, 12 and 24 kV (maker's document); Prysmian Assembly Instructions 81006A (2022), MST 12 to 36 kV, p. 4 (maker's document); Nexans Italia IM1778DI.1, MONOi / MONOe-1, p. 2 (maker's document); powerandcables.com, 132 kV termination masterclass (secondary source)
  3. Cut back the armour and the bedding; carry the armour across the joint or bond it to earth.Sources: Prysmian Assembly Instructions 81006A (2022), MST 12 to 36 kV, p. 4 (maker's document); TEDAŞ-MLZ/99-033.B (2023), 2.2.2 (read in the standard text)
  4. Fold the screen wires back over the sheath, or cut the tape screen; bind them and form the earth lead. HV: open the metal sheath.Sources: Ensto PEM1093ENG 2017-04, HIT1 / HOT1 12 to 36 kV (maker's document); TE Raychem ESD-5243-AU-10/09, OXSU-F 36 kV (maker's document); Nexans Euromold IS 24CSJ2-E-09, 12 and 24 kV (maker's document); Prysmian Assembly Instructions 81006A (2022), MST 12 to 36 kV, p. 4 (maker's document); Nexans Italia IM1778DI.1, MONOi / MONOe-1, p. 3 (maker's document); BS 6622:2007, Annex C.6 (read in the standard text); powerandcables.com, 132 kV termination masterclass (secondary source)
  5. Peel the insulation screen back to its cut-back without cutting into the insulation. HV: finish with glass and taper the screen end.Sources: Ensto PEM1093ENG 2017-04, HIT1 / HOT1 12 to 36 kV (maker's document); TE Raychem ESD-5243-AU-10/09, OXSU-F 36 kV (maker's document); Nexans Euromold IS 24CSJ2-E-09, 12 and 24 kV (maker's document); Prysmian Assembly Instructions 81006A (2022), MST 12 to 36 kV, p. 4 (maker's document); Nexans Italia IM1778DI.1, MONOi / MONOe-1, p. 3 (maker's document); powerandcables.com, 132 kV termination masterclass (secondary source); IEC 60502-2:2014, 19.23.3 (read in the standard text); BS 6622 Annex I (read in the standard text)
  6. Smooth the insulation: no conductive traces, no nicks. HV: polish to the maker's grit and measure the diameter.Sources: Ensto PEM1093ENG 2017-04, HIT1 / HOT1 12 to 36 kV (maker's document); TE Raychem ESD-5243-AU-10/09, OXSU-F 36 kV (maker's document); powerandcables.com, 132 kV termination masterclass (secondary source); Prysmian Assembly Instructions 81006A (2022), MST 12 to 36 kV, p. 6 (maker's document)
  7. Cut the insulation back for the lug or connector without nicking the conductor.Sources: Ensto PEM1093ENG 2017-04, HIT1 / HOT1 12 to 36 kV (maker's document); TE Raychem ESD-5243-AU-10/09, OXSU-F 36 kV (maker's document); Nexans Euromold IS 24CSJ2-E-09, 12 and 24 kV (maker's document); Prysmian Assembly Instructions 81006A (2022), MST 12 to 36 kV, p. 7 (maker's document); Nexans Italia IM1778DI.1, MONOi / MONOe-1, p. 3 (maker's document)
  8. Clean from the cable end towards the insulation screen, never the other way.Sources: Ensto PEM1093ENG 2017-04, HIT1 / HOT1 12 to 36 kV (maker's document); Nexans Euromold IS 24CSJ2-E-09, 12 and 24 kV (maker's document); powerandcables.com, 132 kV termination masterclass (secondary source); Prysmian Assembly Instructions 81006A (2022), MST 12 to 36 kV, p. 6 (maker's document)
  9. Fit the stress control over the screen end: tape, mastic or tube, or a moulded cone.Sources: Ensto PEM1093ENG 2017-04, HIT1 / HOT1 12 to 36 kV (maker's document); TE Raychem ESD-5243-AU-10/09, OXSU-F 36 kV (maker's document); Nexans Euromold IS 24CSJ2-E-09, 12 and 24 kV (maker's document); Prysmian Assembly Instructions 81006A (2022), MST 12 to 36 kV, p. 6 (maker's document); Nexans Italia IM1778DI.1, MONOi / MONOe-1, p. 4 (maker's document); TEDAŞ-MLZ/99-033.B (2023) (read in the standard text); powerandcables.com, 132 kV termination masterclass (secondary source)
  10. Crimp or bolt the lug or connector; file sharp edges and fill the gaps.Sources: Ensto PEM1093ENG 2017-04, HIT1 / HOT1 12 to 36 kV (maker's document); TE Raychem ESD-5243-AU-10/09, OXSU-F 36 kV (maker's document); Nexans Euromold IS 24CSJ2-E-09, 12 and 24 kV (maker's document); Prysmian Assembly Instructions 81006A (2022), MST 12 to 36 kV, p. 7 (maker's document); Nexans Italia IM1778DI.1, MONOi / MONOe-1, p. 3 (maker's document); Klauke die HD 13, DIN 46235 die codes (maker's document)
  11. Shrink, push on or cold shrink the insulation and outer protection; fit sheds outdoors and keep the clearances.Sources: Ensto PEM1093ENG 2017-04, HIT1 / HOT1 12 to 36 kV (maker's document); TE Raychem ESD-5243-AU-10/09, OXSU-F 36 kV (maker's document); Nexans Euromold IS 24CSJ2-E-09, 12 and 24 kV (maker's document); Prysmian Assembly Instructions 81006A (2022), MST 12 to 36 kV, pp. 7 to 9 (maker's document); Nexans Italia IM1778DI.1, MONOi / MONOe-1, pp. 4 to 5 (maker's document)
  12. Earth the screen and the armour. HV: run the bonding leads to the link box.Sources: BS 6622:2007, Annex C.6 (read in the standard text); TEDAŞ-MLZ/99-033.B (2023), 2.3.1 (read in the standard text); Prysmian Assembly Instructions 81006A (2022), MST 12 to 36 kV, p. 5 (maker's document); Nexans Italia IM1778DI.1, MONOi / MONOe-1, p. 5 (maker's document); TE Raychem ESD-5243-AU-10/09, OXSU-F 36 kV (maker's document); powerandcables.com, 132 kV termination masterclass (secondary source); IEC 60840:2011, Annex G (read in the standard text)
  13. Test the cable after installation.Sources: IEC 60502-2:2014, clause 20 (read in the standard text); IEC 60840:2011, clause 16 (read in the standard text); HD 620 S3:2023 (read in the standard text)

Want to see this for your own cable, with the cut-back lengths? Cable end preparation in the cable designer · See Pro