Laying and handling guide

Flexible cords: laying and handling

Rubber and PVC cords to EN 50525, such as H07RN-F and H05VV-F.

Every line names every source that states it and how it was seen; where sources disagree, each value is shown with its source. IEC, EN and HD documents and makers come first, national rules after them with their country.

Laying temperature and pre-warming

No minimum laying temperature from a standard was found for EN 50525 rubber cords such as H07RN-F, nor for LSZH building wire: only the general statement below.

  • Anixter: PVC and thermoplastic LSF turn brittle near 0 °C; elastomers stay flexible to -20 °C, but do not bend them to the minimum radius below -15 °C.Sources: Anixter Sec. 20 p. 20-43 (maker's document)

Laying in winter? Pro checks your town and month against this limit. See Pro

Bending radius

  • EN 50565-1: Rubber cords (H05RR-F, H07RN-F, H05SS-F) and H1Z2Z2-K: fixed 3 D up to 12 mm diameter, 4 D above; free movement 4 D up to 12 mm, 5 D up to 20 mm, 6 D above.Sources: EN 50565-1 (Nexans France); Miguelez (secondary source)
  • EN 50565-1: PVC and LSZH cords (H05VV-F, H05Z1Z1-F): fixed 3 D up to 12 mm diameter, 4 D above; free movement 5 D up to 12 mm, 6 D above.Sources: Miguelez (maker's document)

Pulling force and method

  • 15 N/mm² of copper section, at most 1000 N, in service and for flexible cables in fixed installation; Lapp allows 50 N/mm², at most 1000 N, while installing cables for fixed installation.Sources: EN 50565-1 (Nexans France); Lapp p. 1005 (secondary source)

Work out the pull for your route: the verdict is free, the numbers and the PDF come with Pro. Pull calculation in the cable designer · See Pro

Depth, cover and laying

Not found in the research for this family.

Drum handling

  • Keep the drum upright, its axis horizontal, in storage and in transport; never lay it flat on a flange.Sources: HD 620 Part 1 A.3.2.5, A.3.3.2; IS 1255 7.7, p. 25; Prysmian 2024; Reka (read in the standard text)
  • Never drop a drum. Without lifting gear, use a ramp of about 1:4 (IS 1255: 1:3 to 1:4) with ropes or a winch and a sand bed at the foot.Sources: HD 620 Part 1 A.3.3.3; HD 603 3-I 3.3; IS 1255 7.3, p. 24; Prysmian 2024 p. 6; Reka p. 6; Nexans 2021 p. 4 (read in the standard text)
  • Roll it only short distances on firm ground, in the direction of the arrow on the flange.Sources: HD 620 Part 1 A.3.3.4; HD 603 3-I, 3-L; IS 1255 7.4, p. 24; Prysmian 2024 p. 7; Nexans 2021 p. 3 (read in the standard text)
  • Store it on level, firm, well-drained ground and turn it 90° every 3 months.Sources: IS 1255 7.5, 7.6, pp. 24 to 25; Prysmian 2024 p. 8, 9; Nexans 2021 p. 8, 9; Prysmian Türkiye 3.3 (read in the standard text)
  • Leave the battens on until the cable is about to be laid: they keep off sun and knocks.Sources: HD 620 Part 1 A.3.2.5; BS 6622 D.5.2; IS 1255 7.8, p. 25; Nexans 2021 p. 11 (read in the standard text)
  • Cable ends sealed with caps in transport, storage and laying. A cap missing for over a month, or a wet end: cut back 300 mm, check for moisture and cap again.Sources: HD 620 Part 1 A.3.2.3, A.4.7; HD 603 3-I 3.2; BS 6622 C.3; BS 5467 B.4; BS 7846 A.7.4; IS 1255 7.2, p. 24; Nexans 2021 p. 7; Draka (read in the standard text)
  • Pay out tangentially, never over the flange, with the drum on an axle and jacks and braked. Top or bottom: IS 1255 says off the top; Southwire chooses by where the cable goes (the bottom into a floor conduit, the top into a tray); Nexans Belgium says the bottom, for safety.Sources: HD 620 Part 1 A.4.5; IS 1255 8.2, 8.3, 10.2; Southwire 2005 p. 2 to 3; Nexans Belgium FAQ; Prysmian 2024 p. 10; Draka p. 5, 9 (read in the standard text)

Sheath test after laying

No sheath test after laying was found for this family.