North American cables: laying and handling
THHN, XHHW, MC, TC, MV-90 and MV-105 cables under the NEC.
Every line names every source that states it and how it was seen; where sources disagree, each value is shown with its source. IEC, EN and HD documents and makers come first, national rules after them with their country.
Laying temperature and pre-warming
- Southwire: Lowest air temperature for installation: PVC -10 °C; CSPE or CPE -20 °C; EPR, PE and XLPE -40 °C. Keep the reels at least 24 hours in heated storage first and pull more slowly. THHN and PVC-jacketed MC and TC cables follow the PVC line; XHHW, MV-90 and MV-105 the -40 °C line, unless the maker's sheet says otherwise.Sources: Southwire 2005 p. 2 to 3 (maker's document)
Laying in winter? Pro checks your town and month against this limit. See Pro
Bending radius
- NEC 300.34: Over 1000 V: 8 D unshielded, 12 D shielded or lead-covered, during and after installation.Sources: NEC (Southwire CTS0004) Table 2 (secondary source)
- NEC 330.24: MC cable: 7 D with an interlocked or corrugated sheath; smooth sheath 10 D up to 0.75 in diameter, 12 D up to 1.5 in, 15 D above.Sources: NEC (Southwire CTS0004) Table 1 (secondary source)
- NEC 334.24, 336.24, 338.24, 340.24 · ICEA S-95-658: TC and unshielded, unarmoured cables: 4 D up to 1 in diameter, 5 D up to 2 in, 6 D above; TC with metallic shielding 12 D; NM, SE, USE and UF cables 5 D.Sources: NEC (Southwire CTS0004) Table 1; ICEA (Service Wire) p. 104 (secondary source)
Pulling force and method
- Southwire: On the conductors 0.008 lb/cmil for copper (70.2 N/mm²) and 0.006 lb/cmil for AA-8000 aluminium (52.7 N/mm²); a pulling eye at most 10 000 lb, a basket grip 1000 lb.Sources: Southwire 2005 Table 4, p. 10; Southwire 2024 (maker's document)
- Southwire: Sidewall pressure: 500 lb/ft for 600 V and 5 to 15 kV cables, 300 lb/ft for 25 to 35 kV and interlocked armour (2005); 1000 lb/ft for 8 AWG and larger (2024).Sources: Southwire 2005 Table 7, p. 16; Southwire 2024 p. 1 (maker's document)
- Southwire: Work out the tension section by section (straights, slopes, bends) and the sidewall pressure at every bend, and pull from the end that gives the lower maximum.Sources: Southwire 2005 pp. 13 to 17 (maker's document)
- Guide the cable into a duct along its axis, with a bell mouth at the duct end, in one continuous arc without a reverse bend.Sources: BS 7846 A.7.4 f); IS 1255 6.3.4.4, 6.4.1; Nexans 2021 p. 17; Southwire 2005 p. 3 (read in the standard text)
Work out the pull for your route: the verdict is free, the numbers and the PDF come with Pro. Pull calculation in the cable designer · See Pro
Depth, cover and laying
- NEC Table 300.5: Cover, 0 to 1000 V: direct burial 24 in (600 mm); rigid or intermediate metal conduit 6 in (150 mm); listed nonmetallic raceway 18 in (450 mm); under streets, driveways and parking lots 24 in.Sources: NEC (study guides) (secondary source)
- NEC Table 300.50: Over 1000 V to 22 kV, direct buried: 30 in (750 mm).Sources: NEC (study guides) (secondary source)
- NEC Chapter 9 Table 1: Conduit fill: one cable 53 %, two cables 31 %, more than two 40 %; a multiconductor cable counts as one.Sources: NEC Chapter 9 (study guides); Southwire 2005 Table 8 (secondary source)
Drum handling
- Keep the drum upright, its axis horizontal, in storage and in transport; never lay it flat on a flange.Sources: HD 620 Part 1 A.3.2.5, A.3.3.2; IS 1255 7.7, p. 25; Prysmian 2024; Reka (read in the standard text)
- Never drop a drum. Without lifting gear, use a ramp of about 1:4 (IS 1255: 1:3 to 1:4) with ropes or a winch and a sand bed at the foot.Sources: HD 620 Part 1 A.3.3.3; HD 603 3-I 3.3; IS 1255 7.3, p. 24; Prysmian 2024 p. 6; Reka p. 6; Nexans 2021 p. 4 (read in the standard text)
- Roll it only short distances on firm ground, in the direction of the arrow on the flange.Sources: HD 620 Part 1 A.3.3.4; HD 603 3-I, 3-L; IS 1255 7.4, p. 24; Prysmian 2024 p. 7; Nexans 2021 p. 3 (read in the standard text)
- Store it on level, firm, well-drained ground and turn it 90° every 3 months.Sources: IS 1255 7.5, 7.6, pp. 24 to 25; Prysmian 2024 p. 8, 9; Nexans 2021 p. 8, 9; Prysmian Türkiye 3.3 (read in the standard text)
- Leave the battens on until the cable is about to be laid: they keep off sun and knocks.Sources: HD 620 Part 1 A.3.2.5; BS 6622 D.5.2; IS 1255 7.8, p. 25; Nexans 2021 p. 11 (read in the standard text)
- Cable ends sealed with caps in transport, storage and laying. A cap missing for over a month, or a wet end: cut back 300 mm, check for moisture and cap again.Sources: HD 620 Part 1 A.3.2.3, A.4.7; HD 603 3-I 3.2; BS 6622 C.3; BS 5467 B.4; BS 7846 A.7.4; IS 1255 7.2, p. 24; Nexans 2021 p. 7; Draka (read in the standard text)
- Pay out tangentially, never over the flange, with the drum on an axle and jacks and braked. Top or bottom: IS 1255 says off the top; Southwire chooses by where the cable goes (the bottom into a floor conduit, the top into a tray); Nexans Belgium says the bottom, for safety.Sources: HD 620 Part 1 A.4.5; IS 1255 8.2, 8.3, 10.2; Southwire 2005 p. 2 to 3; Nexans Belgium FAQ; Prysmian 2024 p. 10; Draka p. 5, 9 (read in the standard text)
Every rule for a chosen drum, with its lagging, weight and return terms: Cable drum calculator
Sheath test after laying
No sheath test after laying was found for this family.
The tests after installation for one cable, with their voltages, in the cable designer: Test after installation
In the cable designer
- THHN THWN-2 12 AWG 600 V
- XHHW-2 4/0 AWG 600 V
- MC 12/3 600 V
- MV-105 3/C 2 AWG 15 kV 133 % EPR
- URD 1/0 AWG 15 kV 133 % TR-XLPE full neutral
Cable codes of this family
Terms on this page
bending radius · cable drum (reel) · conduit · conduit fill · cut-back · direct burial · duct (protective pipe) · flange · lagging (battens) · pre-warming (pre-heating) · pulling eye · sheath test (oversheath d.c. test) · spindle (axle) · winch
Sources
- Southwire 2005: Southwire, Power Cable Installation Guide (2005) (maker's document)
- NEC (Southwire CTS0004): NEC 2020 bending rules, as given by Southwire CTS0004 (2022) and EC&M (secondary source)
- ICEA (Service Wire): ICEA S-95-658 Appendix F, as given by Service Wire (secondary source)
- Southwire 2024: Southwire, Maximum Pulling Tension, Ed. 2 (2024) (maker's document)
- BS 7846: BS 7846:2015 (read in the standard text)
- IS 1255: IS 1255:1983 (reaffirmed 2016) (read in the standard text)
- Nexans 2021: Nexans, Instructions for transportation, handling, storage of the drums and laying of the cables, Rev. 01 (2021) (maker's document)
- NEC (study guides): NEC (NFPA 70) Tables 300.5 and 300.50, as given in study guides (secondary source)
- NEC Chapter 9 (study guides): NEC (NFPA 70) Chapter 9 Table 1, as given in study guides (secondary source)
- HD 620: HD 620 S3:2023 (read in the standard text)
- Prysmian 2024: Prysmian Kabel und Systeme, Drum Handling, v3 (2024) (maker's document)
- Reka: Reka Cables, Drum handling guide (2026) (maker's document)
- HD 603: HD 603 S1:1994/A2:2003 (read in the standard text)
- Prysmian Türkiye: Prysmian Türkiye, Cables and Drums User Guide (maker's document)
- BS 6622: BS 6622:2007 (read in the standard text)
- BS 5467: BS 5467:1997+A3:2008 (read in the standard text)
- Draka: Draka Communications, A Guideline for Laying of Cables and Installation of Sleeves (2010) (maker's document)
- Nexans Belgium FAQ: Nexans Belgium, FAQ on the laying and use of cables (maker's document)
Values as the sources print them. For a given job the cable's own standard, the maker's datasheet and the country's rules decide.
Other cable families
LV PVC power cables · LV XLPE power cables · LV armoured cables · Medium voltage cables · High voltage cables · Flexible cords · Control and instrument cables · Solar (PV) cables · LAN data cables · Fibre optic cables · Outdoor telecom cables · Aerial bundled cables · Ship and offshore cables