Aerial bundled cables: laying and handling
Aerial bundled and preassembled cables, with or without a messenger: HD 626, HD 620 10-I2, HD 603 7-B.
Every line names every source that states it and how it was seen; where sources disagree, each value is shown with its source. IEC, EN and HD documents and makers come first, national rules after them with their country.
Laying temperature and pre-warming
National rules
- Italy HD 603 7-A, 7-B: At least 0 °C, while laying or handling.Sources: HD 603 7-B-19 item 5.2 (read in the standard text)
- Italy HD 620 10-I1, 10-I2, 12-I: At least -25 °C, while laying or handling.Sources: HD 620 10-I1-15, 10-I2-17, 12-I-16 (read in the standard text)
Laying in winter? Pro checks your town and month against this limit. See Pro
Bending radius
National rules
- Italy HD 603 7-A: 14 D while laying; 7 D for one controlled bend.Sources: HD 603 7-A-23 (read in the standard text)
- Italy HD 603 7-B: 18 D while laying; 9 D for one controlled bend. D here is the diameter of the largest single core.Sources: HD 603 7-B-20 (read in the standard text)
- Italy HD 620 10-I2: 21 D while laying; 10.5 D for one controlled bend. D here is the core diameter.Sources: HD 620 10-I2-17 (read in the standard text)
Pulling force and method
National rules
- Italy HD 620 10-I2: Preassembled cable with a messenger: the stocking on the messenger carries the load, a second stocking on the bundle only holds the cores; the maximum stress is the maker's.Sources: HD 620 10-I2-17 items 5.3, 5.3.1 (read in the standard text)
- Italy HD 603 7-A, 7-B · HD 620 10-I1, 10-I3, 12-I: On a cable grip at most 10 000 N; on aluminium conductors 30 N/mm².Sources: HD 603 7-A-23, 7-B-20; HD 620 10-I1-16, 10-I3-16, 12-I-17 (read in the standard text)
Work out the pull for your route: the verdict is free, the numbers and the PDF come with Pro. Pull calculation in the cable designer · See Pro
Depth, cover and laying
National rules
Drum handling
- Keep the drum upright, its axis horizontal, in storage and in transport; never lay it flat on a flange.Sources: HD 620 Part 1 A.3.2.5, A.3.3.2; IS 1255 7.7, p. 25; Prysmian 2024; Reka (read in the standard text)
- Never drop a drum. Without lifting gear, use a ramp of about 1:4 (IS 1255: 1:3 to 1:4) with ropes or a winch and a sand bed at the foot.Sources: HD 620 Part 1 A.3.3.3; HD 603 3-I 3.3; IS 1255 7.3, p. 24; Prysmian 2024 p. 6; Reka p. 6; Nexans 2021 p. 4 (read in the standard text)
- Roll it only short distances on firm ground, in the direction of the arrow on the flange.Sources: HD 620 Part 1 A.3.3.4; HD 603 3-I, 3-L; IS 1255 7.4, p. 24; Prysmian 2024 p. 7; Nexans 2021 p. 3 (read in the standard text)
- Store it on level, firm, well-drained ground and turn it 90° every 3 months.Sources: IS 1255 7.5, 7.6, pp. 24 to 25; Prysmian 2024 p. 8, 9; Nexans 2021 p. 8, 9; Prysmian Türkiye 3.3 (read in the standard text)
- Leave the battens on until the cable is about to be laid: they keep off sun and knocks.Sources: HD 620 Part 1 A.3.2.5; BS 6622 D.5.2; IS 1255 7.8, p. 25; Nexans 2021 p. 11 (read in the standard text)
- Cable ends sealed with caps in transport, storage and laying. A cap missing for over a month, or a wet end: cut back 300 mm, check for moisture and cap again.Sources: HD 620 Part 1 A.3.2.3, A.4.7; HD 603 3-I 3.2; BS 6622 C.3; BS 5467 B.4; BS 7846 A.7.4; IS 1255 7.2, p. 24; Nexans 2021 p. 7; Draka (read in the standard text)
- Pay out tangentially, never over the flange, with the drum on an axle and jacks and braked. Top or bottom: IS 1255 says off the top; Southwire chooses by where the cable goes (the bottom into a floor conduit, the top into a tray); Nexans Belgium says the bottom, for safety.Sources: HD 620 Part 1 A.4.5; IS 1255 8.2, 8.3, 10.2; Southwire 2005 p. 2 to 3; Nexans Belgium FAQ; Prysmian 2024 p. 10; Draka p. 5, 9 (read in the standard text)
Every rule for a chosen drum, with its lagging, weight and return terms: Cable drum calculator
Sheath test after laying
No sheath test after laying was found for this family.
The tests after installation for one cable, with their voltages, in the cable designer: Test after installation
Terms on this page
bending radius · conduit · cut-back · flange · lagging (battens) · messenger (catenary wire) · pre-warming (pre-heating) · preassembled cable · sheath test (oversheath d.c. test) · spindle (axle) · vertical run · winch
Sources
- HD 603: HD 603 S1:1994/A2:2003 (read in the standard text)
- HD 620: HD 620 S3:2023 (read in the standard text)
- IS 1255: IS 1255:1983 (reaffirmed 2016) (read in the standard text)
- Prysmian 2024: Prysmian Kabel und Systeme, Drum Handling, v3 (2024) (maker's document)
- Reka: Reka Cables, Drum handling guide (2026) (maker's document)
- Nexans 2021: Nexans, Instructions for transportation, handling, storage of the drums and laying of the cables, Rev. 01 (2021) (maker's document)
- Prysmian Türkiye: Prysmian Türkiye, Cables and Drums User Guide (maker's document)
- BS 6622: BS 6622:2007 (read in the standard text)
- BS 5467: BS 5467:1997+A3:2008 (read in the standard text)
- BS 7846: BS 7846:2015 (read in the standard text)
- Draka: Draka Communications, A Guideline for Laying of Cables and Installation of Sleeves (2010) (maker's document)
- Southwire 2005: Southwire, Power Cable Installation Guide (2005) (maker's document)
- Nexans Belgium FAQ: Nexans Belgium, FAQ on the laying and use of cables (maker's document)
Values as the sources print them. For a given job the cable's own standard, the maker's datasheet and the country's rules decide.
Other cable families
LV PVC power cables · LV XLPE power cables · LV armoured cables · Medium voltage cables · High voltage cables · Flexible cords · Control and instrument cables · Solar (PV) cables · LAN data cables · Fibre optic cables · Outdoor telecom cables · North American cables · Ship and offshore cables