Control and instrument cables: laying and handling
HD 627, BS 5308 and EN 50288-7 cables and the LiYCY family.
Every line names every source that states it and how it was seen; where sources disagree, each value is shown with its source. IEC, EN and HD documents and makers come first, national rules after them with their country.
Laying temperature and pre-warming
No value of its own was found for this family; these are the values for the sheath material, as for LV power cables.
- The limit is the temperature of the cable itself, not of the air: a drum stored in the cold stays cold after the air warms.Sources: HD 620 Part 1 A.4.12; HD 603 3-G, 5-G, 3-I, 4-B; Nexans 2021 p. 11 (read in the standard text)
- HD 603 3-G, 5-G · HD 620 10-A, 10-C, 10-F: Cable temperature while laying and fitting accessories: at least -5 °C with a PVC sheath, -20 °C with a PE sheath; warm the cable when it is colder.Sources: HD 603 3-G-15 item 2; 5-G-15 item 2; HD 620 10-A-25 item 14; 10-C-26 item 14; 10-F-21 (read in the standard text)
National rules
- United Kingdom PAS 5308-1, PAS 5308-2: Cable and air above 0 °C for the previous 24 hours, or special precautions that keep the cable above 0 °C.Sources: PAS 5308 -1 Annex A, p. 11; -2 Annex A, p. 9 (read in the standard text)
Laying in winter? Pro checks your town and month against this limit. See Pro
Bending radius
- HD 627 4-C1, 4-C2: 12 D while laying; 8 D for one controlled bend.Sources: HD 627 4-C1-15, 4-C2-13 (read in the standard text)
- Anixter: BS 5308 Part 1 Type 1: 8 D while laying.Sources: Anixter Sec. 4 p. 3 (maker's document)
- Prysmian UK: BS 7629-1, BS 8436: 6 D while laying.Sources: Prysmian UK p. 2 (maker's document)
National rules
- Germany DIN VDE 0891-5: J-Y(St)Y...Lg: 7.5 D while laying; 5 D for one controlled bend.Sources: DIN VDE 0891-5 Table 1, p. 3 (read in the standard text)
- United Kingdom PAS 5308-1, PAS 5308-2: Type 1, Type 2: 6 D while laying.Sources: PAS 5308 -1 Table B.1, p. 12; -2 Table B.1, p. 10 (read in the standard text)
- United Kingdom PAS 5308-1: Type 3: 15 D while laying.Sources: PAS 5308 -1 Table B.1, p. 12 (read in the standard text)
Pulling force and method
- HD 627 4-C2: On the conductors 50 N/mm² for copper; on a cable grip 5 × D² N.Sources: HD 627 4-C2-13 5.3 c, d (read in the standard text)
- A swivel between the cable grip and the pulling rope.Sources: HD 620 10-R item 15; Draka p. 6 (read in the standard text)
- Watch the tension all through a machine pull and keep the record with the as-laid documents. Prysmian: a winch with a dynamometer, a preset maximum and automatic stop; Draka: without a tension record the maker may refuse a claim.Sources: HD 620 Part 1 A.4.4; HD 603 3-G 3.3; IS 1255 10.3.5; Prysmian 2024 p. 10; Nexans 2021 p. 16; Draka p. 8 (read in the standard text)
Work out the pull for your route: the verdict is free, the numbers and the PDF come with Pro. Pull calculation in the cable designer · See Pro
Depth, cover and laying
National rules
- India IS 1255: At least 0.75 m to the top of the cable for LV and control cables, 0.9 m for 3.3 to 11 kV, 1.05 m for 22 and 33 kV, 1.0 m at road and railway crossings; at least 75 mm of riddled soil or sand below and above, then tiles, bricks or slabs.Sources: IS 1255 6.3.1, 6.3.2, 6.3.6, pp. 16, 19 (read in the standard text)
Drum handling
- Keep the drum upright, its axis horizontal, in storage and in transport; never lay it flat on a flange.Sources: HD 620 Part 1 A.3.2.5, A.3.3.2; IS 1255 7.7, p. 25; Prysmian 2024; Reka (read in the standard text)
- Never drop a drum. Without lifting gear, use a ramp of about 1:4 (IS 1255: 1:3 to 1:4) with ropes or a winch and a sand bed at the foot.Sources: HD 620 Part 1 A.3.3.3; HD 603 3-I 3.3; IS 1255 7.3, p. 24; Prysmian 2024 p. 6; Reka p. 6; Nexans 2021 p. 4 (read in the standard text)
- Roll it only short distances on firm ground, in the direction of the arrow on the flange.Sources: HD 620 Part 1 A.3.3.4; HD 603 3-I, 3-L; IS 1255 7.4, p. 24; Prysmian 2024 p. 7; Nexans 2021 p. 3 (read in the standard text)
- Store it on level, firm, well-drained ground and turn it 90° every 3 months.Sources: IS 1255 7.5, 7.6, pp. 24 to 25; Prysmian 2024 p. 8, 9; Nexans 2021 p. 8, 9; Prysmian Türkiye 3.3 (read in the standard text)
- Leave the battens on until the cable is about to be laid: they keep off sun and knocks.Sources: HD 620 Part 1 A.3.2.5; BS 6622 D.5.2; IS 1255 7.8, p. 25; Nexans 2021 p. 11 (read in the standard text)
- Cable ends sealed with caps in transport, storage and laying. A cap missing for over a month, or a wet end: cut back 300 mm, check for moisture and cap again.Sources: HD 620 Part 1 A.3.2.3, A.4.7; HD 603 3-I 3.2; BS 6622 C.3; BS 5467 B.4; BS 7846 A.7.4; IS 1255 7.2, p. 24; Nexans 2021 p. 7; Draka (read in the standard text)
- Pay out tangentially, never over the flange, with the drum on an axle and jacks and braked. Top or bottom: IS 1255 says off the top; Southwire chooses by where the cable goes (the bottom into a floor conduit, the top into a tray); Nexans Belgium says the bottom, for safety.Sources: HD 620 Part 1 A.4.5; IS 1255 8.2, 8.3, 10.2; Southwire 2005 p. 2 to 3; Nexans Belgium FAQ; Prysmian 2024 p. 10; Draka p. 5, 9 (read in the standard text)
Every rule for a chosen drum, with its lagging, weight and return terms: Cable drum calculator
Sheath test after laying
No sheath test after laying was found for this family.
The tests after installation for one cable, with their voltages, in the cable designer: Test after installation
In the cable designer
- E-YY-J 12x1,5 RE 0,6/1 kV
- LiYCY 4x0,75
- J-Y(St)Y 2x2x0,8
- BS 5308 Part 1 Type 2 10x2x0,5 PE/IS/OS/SWA/PVC
Cable codes of this family
Terms on this page
bending radius · conduit · crossing · cut-back · dynamometer (load cell) · flange · lagging (battens) · pre-warming (pre-heating) · pulling rope · sheath test (oversheath d.c. test) · spindle (axle) · swivel · winch
Sources
- HD 620: HD 620 S3:2023 (read in the standard text)
- HD 603: HD 603 S1:1994/A2:2003 (read in the standard text)
- Nexans 2021: Nexans, Instructions for transportation, handling, storage of the drums and laying of the cables, Rev. 01 (2021) (maker's document)
- PAS 5308: PAS 5308-1:2009 and PAS 5308-2:2009, control and instrumentation cables (PE and PVC insulated), Annexes A and B (informative) (read in the standard text)
- HD 627: HD 627 S1:1996/A2:2005 (read in the standard text)
- Anixter: Anixter EMEA Wire and Cable catalogue (maker's document)
- Prysmian UK: Prysmian UK, Installation, Cable Bending Radii (2022) (maker's document)
- DIN VDE 0891-5: DIN VDE 0891 Teil 5:1985-11 (use of the DIN VDE 0815 installation cables) (read in the standard text)
- Draka: Draka Communications, A Guideline for Laying of Cables and Installation of Sleeves (2010) (maker's document)
- IS 1255: IS 1255:1983 (reaffirmed 2016) (read in the standard text)
- Prysmian 2024: Prysmian Kabel und Systeme, Drum Handling, v3 (2024) (maker's document)
- Reka: Reka Cables, Drum handling guide (2026) (maker's document)
- Prysmian Türkiye: Prysmian Türkiye, Cables and Drums User Guide (maker's document)
- BS 6622: BS 6622:2007 (read in the standard text)
- BS 5467: BS 5467:1997+A3:2008 (read in the standard text)
- BS 7846: BS 7846:2015 (read in the standard text)
- Southwire 2005: Southwire, Power Cable Installation Guide (2005) (maker's document)
- Nexans Belgium FAQ: Nexans Belgium, FAQ on the laying and use of cables (maker's document)
Values as the sources print them. For a given job the cable's own standard, the maker's datasheet and the country's rules decide.