Glossary · Checks after laying · Tests after installation
tests after installation
Tests made once cable and accessories are installed (IEC 60502-2 cl. 20).Sources: Our own wording, from the rules of the laying and handling research (typical practice)
Test of cable and accessories as installed.Sources: IEC 60502-2:2014 20 (read in the standard)
Names in other languages
| Language | Term | Where the name comes from |
|---|---|---|
| English | tests after installation | the research's English term |
| English | test after installation | the research's English term |
| Türkçe | montaj sonrası testler | our own translation (typical practice) |
| Türkçe | montaj sonrası deney | our own translation (typical practice) |
| Deutsch | Prüfungen nach der Verlegung | our own translation (typical practice) |
| Deutsch | Prüfung nach der Verlegung | our own translation (typical practice) |
| Nederlands | beproeving na installatie | our own translation (typical practice) |
| Svenska | provning efter installation | our own translation (typical practice) |
| Français | essais après pose | our own translation (typical practice) |
| Français | essai après pose | our own translation (typical practice) |
| Español | ensayo después de la instalación | our own translation (typical practice) |
| Dansk | prøvning efter installation | our own translation (typical practice) |
| Norsk | prøving etter installasjon | our own translation (typical practice) |
| Suomi | asennuksen jälkeinen koe | our own translation (typical practice) |
| Italiano | prova dopo l'installazione | our own translation (typical practice) |
| Română | încercare după instalare | our own translation (typical practice) |
| Polski | próba po ułożeniu | our own translation (typical practice) |
| Čeština | zkouška po instalaci | our own translation (typical practice) |
| Русский | испытание после монтажа | our own translation (typical practice) |
Related terms
visual inspection · as-laid drawing · cable locator · fault location (sheath fault) · leakage current · metallic screen · oversheath (outer sheath) · pulling protocol (pulling record)
Sources
- Our own wording, from the rules of the laying and handling research (typical practice)
- IEC 60502-2:2014: IEC 60502-2:2014 (owner's scanned copy) (read in the standard)
Definitions are short and in our own words; for a given job the cable's standard and the maker's instructions decide.