Glossary · Tests after installation
acceptance test
Test after accessories, before energising.Sources: AWG PowerGuard (IEEE 400.2 Table 1) (maker's catalogue)
Names in other languages
| Language | Term | Where the name comes from |
|---|---|---|
| English | acceptance test | the research's English term |
| Türkçe | kabul deneyi | our own translation (typical practice) |
| Deutsch | Abnahmeprüfung | IEC 60050 (Electropedia) IEV 151-16-23 (read in the standard) |
| Nederlands | acceptatietest | our own translation (typical practice) |
| Svenska | acceptansprovning | IEC 60050 (Electropedia) IEV 151-16-23 (read in the standard) |
| Français | essai de réception | IEC 60050 (Electropedia) IEV 151-16-23 (read in the standard) |
| Español | ensayo de recepción | IEC 60050 (Electropedia) IEV 151-16-23 (read in the standard) |
| Dansk | accepttest | our own translation (typical practice) |
| Norsk | akseptanseprøve | IEC 60050 (Electropedia) IEV 151-16-23 (read in the standard) |
| Suomi | vastaanottotesti | IEC 60050 (Electropedia) IEV 151-16-23 (read in the standard) |
| Italiano | prova di accettazione | IEC 60050 (Electropedia) IEV 151-16-23 (read in the standard) |
| Română | încercare de recepție | our own translation (typical practice) |
| Polski | badania odbiorcze | IEC 60050 (Electropedia) IEV 151-16-23 (read in the standard) |
| Čeština | přejímací zkouška | our own translation (typical practice) |
| Русский | приемное испытание | IEC 60050 (Electropedia) IEV 151-16-23 (read in the standard) |
Related terms
capacitive test point · commissioning · continuity test · cosine-rectangular wave · fault location (sheath fault) · graphite coating · heating cycle test · humidity test
Sources
- AWG PowerGuard (IEEE 400.2 Table 1): American Wire Group, PowerGuard Testing Recommendations (2021), reproduces IEEE 400.2 Table 1 (maker's catalogue)
- IEC 60050 (Electropedia): IEC 60050, International Electrotechnical Vocabulary (IEV), on Electropedia: the terms an entry gives in each language (read in the standard)
Definitions are short and in our own words; for a given job the cable's standard and the maker's instructions decide.